Legislation
Synopsis
Altering from between 10 to 30 to not less than 26 nautical miles the distances required of certain qualified offshore wind projects from the State shoreline; prohibiting the Public Service Commission from approving certain offshore wind projects unless certain wind turbines are installed; requiring certain wind turbines to be installed in a certain manner for certain purposes; excluding from the calculation of certain ORECs the generation or capacity of certain wind turbines; requiring the Commission to enter a certain order; etc.
Committees
- Original:
- Economic Matters Click to view Recorded Media
Details
History
Toggle History Dropdown
File Code
Toggle Filecode Dropdown
Subjects
Toggle Subjects Dropdown
Statutes
Toggle Statutes Dropdown
(
7-701, 7-704.1, 7-704.2 )
Last Updated: 2/3/2020 2:32 PM