- Title
 - Maryland Co-Location Energy Innovation and Reliability Act
 - Sponsored by
 - Senators Ready and West
 - Status
 - In the Senate - Hearing 3/06 at 1:00 p.m.
 - Analysis
 - Fiscal and Policy Note
 
Synopsis
                                Requiring the Public Service Commission to adopt regulations related to the construction of a generating station that is co-located with a data center but is not interconnected with the electric transmission system or electric distribution system.
                            Committees
                                
                            Committee Testimony
                                    
                                Details
                                
Bill File Type: Regular                                                
                                            
Effective Date(s): October 1, 2025                                                
                                            History
Toggle History Dropdown                                
                            File Code
Toggle Filecode Dropdown                                
                            Subjects
Toggle Subjects Dropdown                                
                            Statutes
Toggle Statutes Dropdown                                
                            
                                        (  
7-207.4                                        )
                                    
                                Last Updated: 3/10/2025 4:37 PM
                        
                
MyMGA
Accessibility Tools