Bill number does not exist. Enter a vaild keyword.

Legislation

Original
Chamber
1st
Reading
Referral
to Cmte
2nd
Reading
3rd
Reading
Opposite
Chamber
1st
Reading
Referral
to Cmte
2nd
Reading
3rd
Reading
Review in
Original Chamber
Passed Both
Chambers
Conf. Cmte
(if necessary)
To Governor
Title
Wastewater Treatment Plants – Water Quality Testing and Sewage Overflow and Pipeline Breakage Notification (Environmental Accountability Act of 2023)
Sponsored by
Delegate R. Long
Status
In the House - Hearing 2/08 at 1:30 p.m.
Analysis
Fiscal and Policy Note
Synopsis
Requiring an independent third party to oversee all water quality testing conducted at a wastewater treatment plant that falsifies or does not accurately report water quality test results to the Department of the Environment or is experiencing a catastrophic or continuing mechanical failure of operational equipment; requiring the Department to select the independent third party; specifying the duties of the independent third party; and establishing certain notification requirements.
Committee Testimony
Details
Introduced in a prior session as: HB0654 Session: 2022 Regular Session
Bill File Type: Regular
Effective Date(s): June 1, 2023
Legislation History
Chamber
House
Calendar Date
1/20/2023
Legislative Date
1/20/2023
Action
First Reading Environment and Transportation
Proceedings
Chamber
House
Calendar Date
1/20/2023
Legislative Date
1/20/2023
Action
Hearing 2/08 at 1:30 p.m.
Proceedings
Chamber Calendar Date Legislative Date Action Proceedings
House 1/20/2023 1/20/2023 First Reading Environment and Transportation
Text - First - Wastewater Treatment Plants – Water Quality Testing and Sewage Overflow and Pipeline Breakage Notification (Environmental Accountability Act of 2023)
House 1/20/2023 1/20/2023 Hearing 2/08 at 1:30 p.m.
(   9-255.1, 9-331.2 )
Last Updated: 6/9/2023 2:24 PM
Click to return on the top page